Difference between revisions of "Cleanroom Equipment"
From OptoelectronicsWiki
Line 11: | Line 11: | ||
* Check [[media:100520_Ebeam4 Probe Metal Deposition.ppt|Deposit Report]] for images using two different orientation for deposition | * Check [[media:100520_Ebeam4 Probe Metal Deposition.ppt|Deposit Report]] for images using two different orientation for deposition | ||
− | + | == Deep RIE (Bosch Etcher) == | |
Restart instructions: | Restart instructions: | ||
Revision as of 18:57, 7 May 2012
- List of tools, manuals, links to NanoFab
- Bowers-specific processes
- Remarks, results, optimization runs
Ebeam4
- Very smooth sidewall profile
- Great sidewall coverage if two directional rotation is used
- Tool notes
- Pumping down around 1 hr
- Use group source
- Check Deposit Report for images using two different orientation for deposition
Deep RIE (Bosch Etcher)
Restart instructions:
Note:You may have to wait for the temperature to stabilize between some of these steps.
1) Restart computer
2) Log in info (only required when restarting) Username: 3333, Password: 3333
3) Click the "ON" button (in the bottom left)
4) Utilities->Turbo Pump ON
5) Click "Standby" button (again in bottom left)
6) Service->Maintenance->Pump->System (Turbo Pump)
7) Process->Batch...File->Load...Select a batch file to load, then close window
8) Click "Ready" button (again in bottom left)
9) You should be ready to go.