Difference between revisions of "Spin-Rinse-Dry"

From OptoelectronicsWiki
Jump to: navigation, search
(Created page with "== Instructions == 1) Load wafers facing the back of the chamber. 2) Press "Power" button. 3) Turn switch to "Hand". (Switch is located behind the tool) 4) Turn on water valv...")
 
(Instructions)
Line 21: Line 21:
  
 
10) Press "Power" button.
 
10) Press "Power" button.
 +
 +
Return to  [[Cleanroom_Equipment]]  

Revision as of 11:50, 15 August 2012

Instructions

1) Load wafers facing the back of the chamber.

2) Press "Power" button.

3) Turn switch to "Hand". (Switch is located behind the tool)

4) Turn on water valve so the handle is vertical and in line with the pipe. (Valve is located behind the tool)

5) Press "Start" button (Green button below the power button). Make sure you see water spraying.

6) Wait until dry cycle begins.

7) Turn switch back to "Auto".

8) Turn water valve off.

9) Remove samples when finished.

10) Press "Power" button.

Return to  Cleanroom_Equipment