Line 27: Line 27:
 
===UCSB-E-Phi-test-2===
 
===UCSB-E-Phi-test-2===
 
III/V lasers and SOAs on SOI;
 
III/V lasers and SOAs on SOI;
 +
Planning:
 +
* 01/31 mask design finished;
 +
* 02/29 fabrication finished;
  
 
===UCSB-E-Phi-test-3===
 
===UCSB-E-Phi-test-3===
Line 40: Line 43:
 
===UCSB-E-Phi-1===
 
===UCSB-E-Phi-1===
 
III/V gain on SOI;
 
III/V gain on SOI;
 +
* 03/15 mask design finished;
 +
* 04/31 fabrication finished;
  
 
===UCSB-E-Phi-2===
 
===UCSB-E-Phi-2===

Revision as of 20:41, 20 December 2011

Planned runs for UCSB - E-Phi

Component test runs

UCSB-E-Phi-test-1

SOI only: test litho and bonding uniformity
Planning:

  • 12/14 ideas due;
  • 12/20 mask review;
  • 01/03 send out mask order;
  • 01/10 - 01/20 fabrication.

Components and structures

  • Bonding test structures
    • Patterns for bonding [Di, Martijn]
  • SOI waveguide test structures
    • Resolution markers, Taper tip test structure [Sudha]
    • Loss test structures [Martijn]
  • SOI component test structures
    • MMIs [Martijn, Yongbo]
    • Bends [Martijn]
    • Offsets [Martijn]
    • 10-GHz and 20-GHz ring filters/oscillators [Martijn]
  • Other ideas
    • WG crossing [Sid]
    • Silicon nanowire tapers [Jock]
    • Taper from 0.8um to 2.0um, change taper length/shape [Sid, Geza]

UCSB-E-Phi-test-2

III/V lasers and SOAs on SOI; Planning:

  • 01/31 mask design finished;
  • 02/29 fabrication finished;

UCSB-E-Phi-test-3

SOI passives coupled to ULLWs;

UCSB-E-Phi-test-4

EDWA test run;

UCSB-E-Phi-test-5

Isolator test run;

Shuttle runs

UCSB-E-Phi-1

III/V gain on SOI;

  • 03/15 mask design finished;
  • 04/31 fabrication finished;

UCSB-E-Phi-2

III/V gain and ULLWs on SOI;

UCSB-E-Phi-3

to be decided: either isolators or EDWAs on a III/V on SOI platform.