Difference between revisions of "HSP priority list"
From OptoelectronicsWiki
Line 1: | Line 1: | ||
=Agenda & Priority List= | =Agenda & Priority List= | ||
− | Back to [[ | + | Back to [[Process Hybrid Silicon]]. |
==Priority list== | ==Priority list== |
Revision as of 20:34, 12 January 2012
Contents
Agenda & Priority List
Back to Process Hybrid Silicon.
Priority list
- Process development:
- Etch-back module (Jock, Jared)
- Need to
- III/V epi design
- Finalize design
- Order epi
- III/V SOA design
- III/V SOA mask design (UCSB-E-Phi-dev-2 @ UCSB E-Phi Runs)
- Issue: Epi will arrive > 3 months -> test process follower with OPSIS run?
Issues brought up in meetings
06/01/2012
- Jon P.: Resist nonuniformity for multiple-die exposure -> >= 1-cm stay-out area?
- Jock: Grating module works for etch depths < 120 nm
- Bandgap issue: PL peak is not equal to lasing wavelength, and lasing wavelength is not equal to SOA gain maximum
- First have nice gain spectrum before we discuss further