* Process development:
 
* Process development:
 
** Etch-back module (Jock, Jared)
 
** Etch-back module (Jock, Jared)
** Need to  
+
** Need to converge on process follow (Excel?)
 
* III/V epi design
 
* III/V epi design
 
** Finalize design
 
** Finalize design

Revision as of 20:35, 12 January 2012

Agenda & Priority List

Back to Process Hybrid Silicon.

Priority list

  • Process development:
    • Etch-back module (Jock, Jared)
    • Need to converge on process follow (Excel?)
  • III/V epi design
    • Finalize design
    • Order epi
  • III/V SOA design
  • III/V SOA mask design (UCSB-E-Phi-dev-2 @ UCSB E-Phi Runs)
    • Issue: Epi will arrive > 3 months -> test process follower with OPSIS run?


Issues brought up in meetings

06/01/2012

  • Jon P.: Resist nonuniformity for multiple-die exposure -> >= 1-cm stay-out area?
  • Jock: Grating module works for etch depths < 120 nm
  • Bandgap issue: PL peak is not equal to lasing wavelength, and lasing wavelength is not equal to SOA gain maximum
    • First have nice gain spectrum before we discuss further