== Optoelectronic Oscillator ==
+
== OEO, PDH, COEO ==
 +
=== PDH Experimentation ===
 +
==== Parts List ====
 +
*[[Equipment]]
 +
*[[Equipment#RF_Components]]
 +
 
 +
=== Parts order priority ===
 +
 
 +
*RF filters
 +
** Medium Q matched to L3 and L4 rings
 +
** Medium Q for future 20GHz rings
 +
 
 
=== Equipment List ===
 
=== Equipment List ===
 
Update with a new version and link
 
Update with a new version and link
Line 12: Line 23:
 
|}
 
|}
  
 +
Acquired:
 +
*Double Balanced mixer 4-40GHz
 +
*~150km fiber (need to check length/loss)(3/16/12)
 +
RF LN pwr and driver amps up to 18GHz
 +
10GHz, 15GHz, RF filters
 
=== Initial Meeting (11/7/11) ===
 
=== Initial Meeting (11/7/11) ===
  
Line 18: Line 34:
 
====Schedule for the OEO setup demonstration for next 2 month====
 
====Schedule for the OEO setup demonstration for next 2 month====
  
  1, 2011,11/08~2011,11/15,  1week
+
*1, 2011,11/08~2011,11/15,  1week
      a, get components together for a basic OEO system (Yao's first demonstration on 1996) (Yongbo)
+
**a, get components together for a basic OEO system (Yao's first demonstration on 1996) (Yongbo)
      b, Phase noise measurement of a signal generator or any commercial product to see whether we can do it and how much we can do. (Danielle)
+
**b, Phase noise measurement of a signal generator or any commercial product to see whether we can do it and how much we can do. (Danielle)
      c, figure out the way how to do polish of the IPhod ring (Daryl)
+
**c, figure out the way how to do polish of the IPhod ring (Daryl)
      d, Paper study (Sudha). Demonstration of the evolution of the OEO systems for typical 4~5 groups (like NIST, OEwave etc), comparison of their systems' performance.
+
**d, Paper study (Sudha). Demonstration of the evolution of the OEO systems for typical 4~5 groups (like NIST, OEwave etc), comparison of their systems' performance.
 +
 
 +
*2, 2011,11/15~2011,11/29, 2weeks
 +
**a, build the basic OEO system and demonstration. (Danielle and Yongbo)
 +
***I', make it work and measure the phase noise
 +
***II', change the components (e.g. different lasers, filters) or some way to improve the system performance.
 +
**b, Order 3D PZT adjuster etc for new OEO stage (Yongbo)
 +
**c, IPhod Ring ship out for polishment (Daryl)
 +
 
 +
*3, 2011,11/29~2011,12/13, 2weeks
 +
**a, replace the fiber by a fiber loop resonator (one bus ring or add-drop ring) and try different configurations (Danielle and Yongbo)
 +
**b, AR coating for the IPhod ring (Daryl)
 +
**c, order necessary components based on the study of the basic OEO system (Yongbo)
  
  2, 2011,11/15~2011,11/29, 2week
+
*4, after 2011,12/13 New PZT stage should be ready, 4week
      a, build the basic OEO system and demonstration. (Danielle and Yongbo)
+
**a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl)
          I', make it work and measure the phase noise
+
          II', change the components (e.g. different lasers, filters) or some way to improve the system performance.
+
      b, Order 3D PZT adjuster etc for new OEO stage (Yongbo)
+
      c, IPhod Ring ship out for polishment (Daryl)
+
  
    3, 2011,11/29~2011,12/13, 2week
 
      a, replace the fiber by a fiber loop resonator (one bus ring or add-drop ring) and try different configurations (Danielle and Yongbo)
 
      b, AR coating for the IPhod ring (Daryl)
 
      c, order necessary components based on the study of the basic OEO system (Yongbo)
 
  
    4, after 2011,12/13 New PZT stage should be ready, 4week
+
[[Media:Geza's wet chemistry.pdf|Etching File]]
      a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl)
+

Latest revision as of 16:46, 28 June 2012

OEO, PDH, COEO[edit]

PDH Experimentation[edit]

Parts List[edit]

Parts order priority[edit]

  • RF filters
    • Medium Q matched to L3 and L4 rings
    • Medium Q for future 20GHz rings

Equipment List[edit]

Update with a new version and link

File Date Version Number Notes/Updates
File:2011 0707 Equipment for OEO PDH.xlsx 11/7/11 1  
[[File:]]      

Acquired:

  • Double Balanced mixer 4-40GHz
  • ~150km fiber (need to check length/loss)(3/16/12)

RF LN pwr and driver amps up to 18GHz 10GHz, 15GHz, RF filters

Initial Meeting (11/7/11)[edit]

Danielle's Simulations[edit]

File:2011 1031 Danielle OEO presentation.pptx

Schedule for the OEO setup demonstration for next 2 month[edit]

  • 1, 2011,11/08~2011,11/15, 1week
    • a, get components together for a basic OEO system (Yao's first demonstration on 1996) (Yongbo)
    • b, Phase noise measurement of a signal generator or any commercial product to see whether we can do it and how much we can do. (Danielle)
    • c, figure out the way how to do polish of the IPhod ring (Daryl)
    • d, Paper study (Sudha). Demonstration of the evolution of the OEO systems for typical 4~5 groups (like NIST, OEwave etc), comparison of their systems' performance.
  • 2, 2011,11/15~2011,11/29, 2weeks
    • a, build the basic OEO system and demonstration. (Danielle and Yongbo)
      • I', make it work and measure the phase noise
      • II', change the components (e.g. different lasers, filters) or some way to improve the system performance.
    • b, Order 3D PZT adjuster etc for new OEO stage (Yongbo)
    • c, IPhod Ring ship out for polishment (Daryl)
  • 3, 2011,11/29~2011,12/13, 2weeks
    • a, replace the fiber by a fiber loop resonator (one bus ring or add-drop ring) and try different configurations (Danielle and Yongbo)
    • b, AR coating for the IPhod ring (Daryl)
    • c, order necessary components based on the study of the basic OEO system (Yongbo)
  • 4, after 2011,12/13 New PZT stage should be ready, 4week
    • a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl)