Line 1: | Line 1: | ||
− | == | + | == OEO, PDH, COEO == |
+ | === PDH Experimentation === | ||
+ | ==== Parts List ==== | ||
+ | *[[Equipment]] | ||
+ | *[[Equipment#RF_Components]] | ||
+ | |||
+ | === Parts order priority === | ||
+ | |||
+ | *RF filters | ||
+ | ** Medium Q matched to L3 and L4 rings | ||
+ | ** Medium Q for future 20GHz rings | ||
+ | |||
=== Equipment List === | === Equipment List === | ||
Update with a new version and link | Update with a new version and link | ||
Line 12: | Line 23: | ||
|} | |} | ||
+ | Acquired: | ||
+ | *Double Balanced mixer 4-40GHz | ||
+ | *~150km fiber (need to check length/loss)(3/16/12) | ||
+ | RF LN pwr and driver amps up to 18GHz | ||
+ | 10GHz, 15GHz, RF filters | ||
=== Initial Meeting (11/7/11) === | === Initial Meeting (11/7/11) === | ||
Line 38: | Line 54: | ||
*4, after 2011,12/13 New PZT stage should be ready, 4week | *4, after 2011,12/13 New PZT stage should be ready, 4week | ||
**a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl) | **a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl) | ||
+ | |||
+ | |||
+ | [[Media:Geza's wet chemistry.pdf|Etching File]] |
Latest revision as of 16:46, 28 June 2012
Contents
OEO, PDH, COEO[edit]
PDH Experimentation[edit]
Parts List[edit]
Parts order priority[edit]
- RF filters
- Medium Q matched to L3 and L4 rings
- Medium Q for future 20GHz rings
Equipment List[edit]
Update with a new version and link
File | Date | Version Number | Notes/Updates |
---|---|---|---|
File:2011 0707 Equipment for OEO PDH.xlsx | 11/7/11 | 1 | |
[[File:]] |
Acquired:
- Double Balanced mixer 4-40GHz
- ~150km fiber (need to check length/loss)(3/16/12)
RF LN pwr and driver amps up to 18GHz 10GHz, 15GHz, RF filters
Initial Meeting (11/7/11)[edit]
Danielle's Simulations[edit]
File:2011 1031 Danielle OEO presentation.pptx
Schedule for the OEO setup demonstration for next 2 month[edit]
- 1, 2011,11/08~2011,11/15, 1week
- a, get components together for a basic OEO system (Yao's first demonstration on 1996) (Yongbo)
- b, Phase noise measurement of a signal generator or any commercial product to see whether we can do it and how much we can do. (Danielle)
- c, figure out the way how to do polish of the IPhod ring (Daryl)
- d, Paper study (Sudha). Demonstration of the evolution of the OEO systems for typical 4~5 groups (like NIST, OEwave etc), comparison of their systems' performance.
- 2, 2011,11/15~2011,11/29, 2weeks
- a, build the basic OEO system and demonstration. (Danielle and Yongbo)
- I', make it work and measure the phase noise
- II', change the components (e.g. different lasers, filters) or some way to improve the system performance.
- b, Order 3D PZT adjuster etc for new OEO stage (Yongbo)
- c, IPhod Ring ship out for polishment (Daryl)
- a, build the basic OEO system and demonstration. (Danielle and Yongbo)
- 3, 2011,11/29~2011,12/13, 2weeks
- a, replace the fiber by a fiber loop resonator (one bus ring or add-drop ring) and try different configurations (Danielle and Yongbo)
- b, AR coating for the IPhod ring (Daryl)
- c, order necessary components based on the study of the basic OEO system (Yongbo)
- 4, after 2011,12/13 New PZT stage should be ready, 4week
- a, demonstration of the new system with the fiber ring replaced by the IPhod ring (Danielle and Yongbo, Daryl)