Difference between revisions of "Cleanroom Equipment"
Jaredhulme (Talk | contribs) |
Jaredhulme (Talk | contribs) |
||
Line 12: | Line 12: | ||
== Deep RIE (Bosch Etcher) == | == Deep RIE (Bosch Etcher) == | ||
+ | [[Deep_RIE_Bosch_Etcher]] | ||
Restart instructions: | Restart instructions: | ||
Revision as of 11:51, 15 August 2012
- List of tools, manuals, links to NanoFab
- Bowers-specific processes
- Remarks, results, optimization runs
Ebeam4
- Very smooth sidewall profile
- Great sidewall coverage if two directional rotation is used
- Tool notes
- Pumping down around 1 hr
- Use group source
- Check Deposit Report for images using two different orientation for deposition
Deep RIE (Bosch Etcher)
Deep_RIE_Bosch_Etcher Restart instructions:
Note:You may have to wait for the temperature to stabilize between some of these steps.
1) Restart computer
2) Log in info (only required when restarting) Username: 3333, Password: 3333
3) Click the "ON" button (in the bottom left)
4) Utilities->Turbo Pump ON
5) Click "Standby" button (again in bottom left)
6) Service->Maintenance->Pump->System (Turbo Pump)
7) Process->Batch...File->Load...Select a batch file to load, then close window
8) Click "Ready" button (again in bottom left)
9) Windows->Overview Diagram...and...You should be ready to go.
DUV STEPPER
Current - DUV Stepper Waveguides: Media:DUV_Stepper_Waveguides_Development.pptx
DUV Stepper Waveguides Update: Media:DUV Stepper Waveguides_2.pptx
DUV Stepper Waveguides Update: Media:DUV Stepper Waveguides_1.pptx
Additional files for
DUV Lithography Characterization