Difference between revisions of "Device Run"

From OptoelectronicsWiki
Jump to: navigation, search
Line 15: Line 15:
 
|-
 
|-
 
| '''Mach-Zehnder modulator''' || MZM rev2 || [[media:100309_slotline_G2_tapeout.tdb|download]] ||[[media:100309_Stepper_coordinates_and_GDS_number.xls‎|download]] ||[[media:100401_Slotline_rev2.xls‎|download]] || [[media:100122_slotline_process_flow.ppt‎|download]] || Hui-Wen ||APR, 2010|| slotline design rev2 || done ||  
 
| '''Mach-Zehnder modulator''' || MZM rev2 || [[media:100309_slotline_G2_tapeout.tdb|download]] ||[[media:100309_Stepper_coordinates_and_GDS_number.xls‎|download]] ||[[media:100401_Slotline_rev2.xls‎|download]] || [[media:100122_slotline_process_flow.ppt‎|download]] || Hui-Wen ||APR, 2010|| slotline design rev2 || done ||  
 +
|-
 +
| '''EA modulator''' || EAM10 || [[Media: EAM10_Mask.zip]] ||[[Media:EAM10_process.xls‎]] ||[[media:100401_Slotline_rev2.xls‎|download]] || [[Media:EAM10_process.pptx]] || Yongbo ||APR, 2010|| EAM/TW/Segmented || done ||  
 
|-
 
|-
 
|'''High power MLL''' || HP-MLL rev1 || [[media:HP_MLL_Ledit_v11_rev_5-10by_Mike_in_Ledit_11.zip|download]] || N/A || [[media:20110112_HP-MLL_process_follower.docx‎ |download]] || [[media:HP_MLL_Process_flow_of_October_25.pptx‎|download]] || Mike || Dec 2010 ||   || in progress || [[High-power_MLL|High-power MLL]];
 
|'''High power MLL''' || HP-MLL rev1 || [[media:HP_MLL_Ledit_v11_rev_5-10by_Mike_in_Ledit_11.zip|download]] || N/A || [[media:20110112_HP-MLL_process_follower.docx‎ |download]] || [[media:HP_MLL_Process_flow_of_October_25.pptx‎|download]] || Mike || Dec 2010 ||   || in progress || [[High-power_MLL|High-power MLL]];

Revision as of 18:50, 11 May 2011

  • Please contribute your mask layout and process follower here.
  • This page is used to help everyone get track of the mask sets and related process files.
  • Note there are two tables


Project Name of mask set Mask file Mask Polarity and Coordinates Process follower Process illustration Created by date Note Status Project page
SWEEPER     N/A download download Jon May, 2011   In progress SWEEPER;
PhASER PhASER rev1 download N/A download download Hui-Wen JUN, 2008   done  
  PhASER rev2 download download download download Hui-Wen AUG, 2009 Spiral delay lines done PhASER;
Mach-Zehnder modulator MZM rev2 download download download download Hui-Wen APR, 2010 slotline design rev2 done  
EA modulator EAM10 Media: EAM10_Mask.zip Media:EAM10_process.xls‎ download Media:EAM10_process.pptx Yongbo APR, 2010 EAM/TW/Segmented done  
High power MLL HP-MLL rev1 download N/A download download Mike Dec 2010   in progress High-power MLL;
AWG receiver AWG receiver rev.1 download download download     2009   in progress AWG Receiver;
Super Lattice     download download download Hui-Wen Oct, 2009     Superlattice


Chip table
Run ID wafer mask process flow process follower operator logbook results
SOIBuffer2R 1             Summary of data.
SOIBuffer2R 2             Grass during mesa etch. New batch started.
SOIBuffer2R 3             Negative PR residue over III-V couldn't be cleaned off. Process follower adjusted.
SOIBuffer2R 4       Process follower     Testing in progress
#1727 W394 Jared design Lionix 80-nm core        
#1727 W395 Jared design Lionix 80-nm core        
Short Loop 2010 06   SOIBuffer2R   Process follower Geza   Testing in progress