File list
From OptoelectronicsWiki
This special page shows all uploaded files.
![]() |
Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
16:07, 2 August 2012 | Diode Lasers and Photonic Integrated Circuits - Larry Coldren.rar (file) | ![]() |
6.78 MB | Jock | 1 | |
13:12, 2 August 2012 | DUV Lithography Test on Si.rar (file) | ![]() |
5.29 MB | Jock | 1 | |
11:22, 2 August 2012 | DUV Stepper Waveguides 1.pptx (file) | ![]() |
4.84 MB | Jaredhulme | 2 | |
16:52, 1 August 2012 | SEM Gratings 8 1 12.zip (file) | ![]() |
1.3 MB | Jaredhulme | 1 | |
15:27, 1 August 2012 | SEM Gratings 8 1 12.pptx (file) | ![]() |
3.56 MB | Jaredhulme | 1 | |
14:02, 30 July 2012 | Implant3B litho.zip (file) | ![]() |
675 KB | Jaredhulme | 1 | |
14:02, 30 July 2012 | Post imp3A PR strip.zip (file) | ![]() |
1.92 MB | Jaredhulme | 1 | |
13:45, 30 July 2012 | FimmwaveJuly2012.rar (file) | ![]() |
96.58 MB | Jock | 1 | |
10:00, 26 July 2012 | SWEEPER Actives Trav v21 2b ACTIVE SI ONLY.docx (file) | ![]() |
71 KB | JKD | 1 | |
16:24, 24 July 2012 | Ndopelithopics.zip (file) | ![]() |
3.34 MB | Jaredhulme | 1 | |
12:15, 24 July 2012 | Process flow SWEEPER RUN3 1 trav v21 2.pptx (file) | ![]() |
154 KB | JKD | 1 | |
12:13, 24 July 2012 | SWEEPER Actives Trav v21 2 ACTIVE SI ONLY.docx (file) | ![]() |
72 KB | JKD | - Blanks filled in for SU8, nitride etches - heavy ion implant moved to end to avoid exceeding thermal budget - SU8/nitride to be opened for gratings, heavy ion, during VIA2 (probe via) litho, then oxide/nitride protection layers opened during GO (grating | 2 |
09:15, 23 July 2012 | Sample2 SEM post si etch.zip (file) | ![]() |
3.02 MB | Jaredhulme | 2 | |
15:46, 18 July 2012 | VernierScale12 5nm.gds (file) | ![]() |
19 KB | Jock | 2 | |
14:19, 18 July 2012 | SWEEPER Actives Trav v21 1 ACTIVE SI ONLY.docx (file) | ![]() |
65 KB | Jaredhulme | 1 | |
13:32, 18 July 2012 | Sample2 post si etch.zip (file) | ![]() |
453 KB | Jaredhulme | 1 | |
12:44, 18 July 2012 | ASML Alignment Mark.gds (file) | ![]() |
3 KB | Jock | 2 | |
10:33, 18 July 2012 | Sample2 pre si etch.zip (file) | ![]() |
491 KB | Jaredhulme | 1 | |
10:33, 18 July 2012 | Sample1 pre si etch.zip (file) | ![]() |
886 KB | Jaredhulme | 1 | |
10:33, 18 July 2012 | Dummy post pr strip pre rib etch.zip (file) | ![]() |
354 KB | Jaredhulme | 1 | |
09:44, 17 July 2012 | Rib litho pics.zip (file) | ![]() |
1.14 MB | JKD | 1 | |
12:06, 16 July 2012 | ComsolThermal.rar (file) | ![]() |
1.81 MB | Molly | Example comsol thermal simulation - hybrid Si laser crosstalk | 1 |
23:55, 14 July 2012 | AAA aSi RIBLAYER.cif (file) | ![]() |
9.63 MB | JKD | 1 | |
15:15, 13 July 2012 | III-V mesa etch completed on SOA1.pptx (file) | ![]() |
4.81 MB | Michael Davenport | 3 | |
09:36, 13 July 2012 | SWEEPER Actives Trav v21 0 ACTIVE SI ONLY.docx (file) | ![]() |
70 KB | JKD | Phase modulator run - July/Aug 2012 - using active Si only (i.e. no III-V). Devices include phase modulators using current injection, carrier depletion, and thermooptic for comparison. Several types of structures are included (MZI's using MMI's and dire | 1 |
21:13, 12 July 2012 | Ephi Mesa Etching v2.xlsx (file) | ![]() |
14 KB | Michael Davenport | 1 | |
12:03, 12 July 2012 | WGPD fullprocess.pptx (file) | ![]() |
572 KB | Molly | 2 | |
12:03, 12 July 2012 | WGPD Si v2.xlsx (file) | ![]() |
32 KB | Molly | 2 | |
10:37, 12 July 2012 | Hybrid Silicon Process Follower - v1.2.xlsx (file) | ![]() |
48 KB | Jaredhulme | Automatic step numbering | 4 |
14:14, 3 July 2012 | QUOTE UCSB25940-BH-05L (08-08-10).xls (file) | ![]() |
118 KB | Molly | 2 | |
12:46, 29 June 2012 | TapersDUV.zip (file) | ![]() |
12 KB | Jock | 1 | |
21:08, 28 June 2012 | ICP2 CF4-CHF3-O2 Deep Nano Etch.pptx (file) | ![]() |
1.33 MB | Jock | 2 | |
12:48, 25 June 2012 | UCSB MOF.doc (file) | ![]() |
222 KB | Jock | 2 | |
12:12, 20 June 2012 | LibmaskV6 00.zip (file) | ![]() |
1.09 MB | Jock | 5 | |
00:49, 20 June 2012 | MaskFinal.zip (file) | ![]() |
22.59 MB | Sfaralli | Mask of the DQPSK receiver (Second Run) | 1 |
00:22, 20 June 2012 | 6 27 2011 DQPSK Receiver coordinates.ppt (file) | ![]() |
162 KB | Sfaralli | DQPSK Receiver Coordinates for the Mask Layout | 1 |
17:12, 16 June 2012 | W0100P Y Tang.pptx (file) | ![]() |
5.07 MB | Yongbo | 1 | |
17:06, 16 June 2012 | Simulation result 20110914.pptx (file) | ![]() |
246 KB | Yongbo | 1 | |
17:05, 16 June 2012 | ElectrodeDesign.zip (file) | ![]() |
61 KB | Yongbo | Including two packages: one for segmented electrode; the other one for the capacitively-loaded electrode. | 1 |
16:47, 16 June 2012 | CPW Test.zip (file) | ![]() |
117 KB | Yongbo | CPW Mask for parameter extraction of the passive transmission lines | 1 |
16:38, 16 June 2012 | HybridEAM11 Taper.zip (file) | ![]() |
7 KB | Yongbo | 1 | |
16:37, 16 June 2012 | HybridWaveguideCrossSection.zip (file) | ![]() |
1 KB | Yongbo | 1 | |
16:27, 16 June 2012 | Hybrid optical EAM 1550nm polarization structure up stand.m (file) | ![]() |
11 KB | Yongbo | Support TE or TM mode Support tilt QW edge. Useful for most hybrid silicon waveguide | 1 |
16:19, 16 June 2012 | OI2012 Y Tang.pptx (file) | ![]() |
7.47 MB | Yongbo | 1 | |
16:17, 16 June 2012 | OFC2012 Y Tang v2.2.pptx (file) | ![]() |
7.51 MB | Yongbo | 1 | |
18:01, 14 June 2012 | K&L 20.5GHz-2GHz.pdf (file) | ![]() |
4.82 MB | Daryl | 1 | |
17:06, 14 June 2012 | BondingChuck.pptx (file) | ![]() |
69 KB | Geza | Schematics for 4" bonding chuck. Designed by Geza, Jock and Jon Peters. | 1 |
11:42, 13 June 2012 | Equipment intrailer updated 6-13 by mike.docx (file) | ![]() |
10 KB | Michael Davenport | 1 | |
11:26, 8 June 2012 | 2012 06 08 Sweeper Summary.xlsx (file) | ![]() |
373 KB | Peters | 1 | |
09:46, 8 June 2012 | 20120608 SF6 Silicon etch.pptx (file) | ![]() |
1.16 MB | Peters | 1 |
![]() First page |
![]() Previous page |
![]() Next page |
![]() Last page |